Max Systems Private Limited
Lajpat Nagar 4, New Delhi, Delhi
GST No. 07AAACM8244R1ZV
TrustSEAL Verified
Call 0804605776052% Response Rate
SEND EMAIL

Data Center Solutions

Providing you the best range of data center ., data center setup, datacentre power and cooling system analysis and data center infrastructure with effective & timely delivery.

Data Center .

Data Center .
  • Data Center .
  • Data Center .
  • Data Center .
  • Data Center .
Ask For Price
Product Price :Get Latest Price
Product Brochure

Product Details:

Service LocationPan India
ModeOffline
Payment termAdvance , Online
Mode of serviceSite Visit
ApplicationNetworking

Data center operations comprise the systems and workflows within a data center that keep the data center running. Data center operations include installing and maintaining network resources, ensuring data center security and monitoring systems that take care of power and cooling.
Request
Callback
Yes! I am interested

Data Center Setup

Data Center Setup
  • Data Center Setup
  • Data Center Setup
  • Data Center Setup
Ask For Price
Product Price :Get Latest Price
Product Brochure

Product Details:

Service LocationPan India
ApplicationNetworking
Payment ModeOnline, Offline
Service ModeSite Visit
Service TypeOffline

Data center components require significant infrastructure to support the center's hardware and software. These include power subsystems, uninterruptible power supplies (UPS), ventilation, cooling systems, fire suppression, backup generators, and connections to external networks.
Request
Callback
Yes! I am interested

Datacentre Power And Cooling System Analysis

Datacentre Power And Cooling System Analysis
  • Datacentre Power And Cooling System Analysis
  • Datacentre Power And Cooling System Analysis
  • Datacentre Power And Cooling System Analysis
Ask For Price
Product Price :Get Latest Price
Product Brochure

Product Details:

Service LocationPan India
Service ModeSite Visit
Service TypeOffline
ApplicationBackup
Payment termAdvance, Online

Because most HVAC systems are sized in tons, we can use the standard conversion equations (watts x 3.41 = BTU/hour) and (BTU/hour / 12,000 = tons of cooling): 76 kW = 880,760 W x 3.41 = 3,003,391.6 BTU/hour. 3,003,391.6 BTU/hour / 12,000 = 250.28 t of max cooling needed.28-Apr-2022
Request
Callback
Yes! I am interested

Data Center Infrastructure

Data Center Infrastructure
  • Data Center Infrastructure
  • Data Center Infrastructure
  • Data Center Infrastructure
Ask For Price
Product Price :Get Latest Price
Product Brochure

Product Details:

Service LocationPan India
Payment TermAdvance, Online
ApplicationNetworking
Service ModeSite Visit
Service TypeOffline

Data center components require significant infrastructure to support the center's hardware and software. These include power subsystems, uninterruptible power supplies (UPS), ventilation, cooling systems, fire suppression, backup generators, and connections to external networks.
Request
Callback
Yes! I am interested
X

Explore More Products

View All Products




Reach Us
S.Datta (Director)
Max Systems Private Limited
B-133, Lajpat Nagar 1
New Delhi - 110024, Delhi, India
Get Directions


Call Us


Send E-mail